Showing posts with label Metro. Show all posts
Showing posts with label Metro. Show all posts

Tuesday, 5 March 2019

"One Nation One Card" for Metro, Local Train, Buses across India. NPCI, CDAC and Bharat Electronics develop National Common Mobility Card.


National Payments Corporation of India, Centre for Development of Advanced Computing and Bharat Electronics Limited have jointly developed an intelligent transport system smart-card. In line with the spirit of 'One Nation', the smart card once recharged can be used anywhere on any metro system, suburban trains, and buses across India. At this moment, the Delhi Metro card cannot be used on AFC gates in Mumbai Metro. Similarly, Mumbai Metro, Monorail, Local trains and BEST buses issue different smart cards dedicated only for its respective ticketing service.

Soon, a Pan-India transport card will be made available for the common public. Such smart cards are operational in advanced city nations like Singapore and Hong Kong. Transport evangelists believe that other services like taxis and toll tax could also be linked on this National Common Mobility Card.

PM Narendra Modi launched today One Nation, One Card for transport mobility at a function in Ahmedabad today. The Indigenous Automatic Fare Collection System based on One Nation One Card Model i.e. National Common Mobility Card (NCMC) is the first of its kind in India.

India’s First Indigenously Developed Payment Eco-system for transport consisting of NCMC Card, SWEEKAR (Swachalit Kiraya: Automatic Fare Collection System) and SWAGAT (Swachalit Gate) is based on NCMC Standards.

A new era of Smart Transportation

Public Transport is extensively used across India as the economical and convenient mode of commuting for all classes of society. Cash continues to be the most preferred mode of fare payments across the public transport. However, there are multiple challenges associated with the cash payment e.g. cash handling, revenue leakages, cash reconciliation etc. Various initiatives have been taken by transit operators to automate & digitize the fare collection using Automatic Fare Collection System (AFC). The introduction of closed loop cards issued by these operators helped to digitize the fare collection to a significant extent. However, the restricted usability of these payment instruments limits the digital adoption by customers.

AFC System (gates, readers/validators, backend infrastructure etc.) is the core of any transit operator to automate the fare collection process. The major challenge associated with AFC system implementation in India till now is the lack of indigenous solution provider. Till now, AFC systems deployed at various Metros are from foreign players. In order to avoid the vendor lock-in and create an interoperable system, there was a need to develop indigenous standards and AFC system under Make in India initiative.

In order to ensure a seamless travel across metros and other transport systems in addition to retail shopping and purchases, the Ministry of Housing & Urban Affairs (MoHUA) came out with the National Common Mobility Card (NCMC) Program. 

A committee was formed with representatives from National Informatics Centre (NIC), Centre for Development of Advance Computing (C-DAC), Bureau of Indian Standards (BIS), National Payment Corporation of India (NPCI) and the Ministry of Finance with an objective to develop the vendor agnostic interoperable ecosystem for NCMC including indigenous AFC System and banking interface. 

NPCI was given the mandate to develop the specifications for card & terminal to support the NCMC ecosystem. Based on the best global practices and dynamics of Indian market, the committee recommended EMV based Open Loop Card with stored value as NCMC

CDAC has entrusted the task of finalization of NCMC specification for AFC system including the interface with Bank server. CDAC worked in collaboration with NPCI to complete this activity. Thereafter, BEL was roped in for making Gates & Reader.

The Gate & Reader prototype has been made by BEL. This is the first gate and the reader which has been manufactured by an Indian company. This is also the first indigenous payment reader which has been certified as per International standards. India joins the very few elite nations who have indigenous capacity on gate and reader production.

NCMC Ecosystem offers the value proposition for customers as they need not to carry multiple cards for different usage. Further, the super quick contactless transactions will improve the seamless experience. For operators, NCMC ecosystem brings common standards for implementation without vendor lock-in.

This will also help in higher digital payments penetration, savings on closed loop card lifecycle management cost and reduced operating cost. The rich data insights may be used by operators for business intelligence leading to efficient operation. 

With the NCMC Ecosystem, banks will get an access to segments which are highly driven by cash but stickiness in nature. NCMC Ecosystem will further help the government in digitization of low-value payments and reduced cost for the entire ecosystem. 

In order to showcase the entire NCMC ecosystem for digital fare collection, the complete AFC system has been deployed in Delhi Metro Rail Corporation (DMRC) across few stations for field trial purpose. Under this pilot, NCMC compliant gates have been deployed at various stations of DMRC and cards have been issued by multiple banks to the users.

The pilot at DMRC was inaugurated by MoHUA on Jan 31st, 2019. This pilot will help to improve hardware reliability and fine tuning of the software. This will also facilitate large scale indigenous production and deployment in the Indian transit system. The first level trails has been successfully completed in collaboration with CDAC, BEL, NPCI and SBI.

'One Nation One Card'

Public Sector Banks like SBI will issue Debit/Credit/Prepaid cards and the customer may use this single card for payments across all segments including metro, bus, suburban railways, toll, parking, smart city and retail. The stored value on card supports offline transaction across all travel needs with minimal financial risk to involved stakeholders. The service area feature of this card supports operator specific applications e.g. monthly passes, season tickets etc.

The National Common Mobility Card (NCMC) to enable seamless travel by different metros and other transport systems across the country besides retail shopping and purchases is an initiative of the Ministry of Housing & Urban Affairs. The card will address the challenges associated with the cash payment e.g. cash handling, revenue leakages, cash reconciliation etc. Various initiatives have been taken by transit operators to automate & digitize the fare collection using Automatic Fare Collection System (AFC). The introduction of closed loop cards issued by these operators helped to digitize the fare collection to a significant extent. However, the restricted usability of these payment instruments limits the digital adoption by customers. 

The customers need not carry multiple cards for different usage. Further, the super quick contactless transactions will improve the seamless experience. This will also help in higher digital payments penetration, savings on closed loop card lifecycle management cost and reduced operating cost. The rich data insights may be used by operators for business intelligence leading to efficient operation.

Source - Press Information Bureau.

Thursday, 8 November 2018

Delhi Metro Phase III gets Rs 3300 crores ODA loan from Japan's JICA.


Japan International Cooperation Agency (JICA) signed an agreement with the Government of India to provide Official Development Assistance (ODA) Loan of 53,675 million Japanese Yen (approximately INR 3,300 crore) for the ‘Delhi Mass Rapid Transport System Project Phase 3 (Tranche III)'.

The objective of the Project is to cope with the increasing traffic demand in Delhi by expanding mass transit systems, thereby mitigating traffic congestion, reducing air pollution, minimizing road accidents and making travel smoother for the people in New Delhi. The scope of the Phase 3 includes the construction of Pink Line and Magenta Line and the extension of Yellow Line, Blue Line, Green Line and Violet Line. The Phase 3 will add 159.7 kilometers to the existing Delhi Metro Line and will connect 109 metro stations.

The ODA loan agreement was signed between Shohei Hara, Director General, South Asia Department, JICA and Mr. Sujan R. Chinoy, Ambassador of India to Japan on October 29, 2018 at Tokyo.

The Executing Agency for the Project is Delhi Metro Rail Corporation Limited. The Project envisages building of an efficient transportation system for the city, catering to the growing population. With high growth in transport demand, congestion on roads has been increasing and the mode of travel in favor of public transportation has remained around 50%. It is expected that the mode of travel in favor of public transport will increase to 60% upon commissioning of the Project, while the mode of travel in favor of Delhi Metro will increase to 19% from the current 15%.

"With the signing of Tranche-III of Delhi Metro ODA Loan, JICA has continued to fulfill its commitment of improving the mobility in the capital city. We are pleased to support the network of Delhi Metro which has now reached a cumulative length of 349.7 kilometers. Delhi Metro Rail Corporation (DMRC) shares an over two-decade-long association with JICA, and with the signing of this ODA loan agreement, our bond is only going to grow stronger." - Mr. Katsuo Matsumoto, Chief Representative, JICA India.

JICA has extended a cumulative total of 705,206 million Japanese Yen (approximately 45,000 crores) in ODA loans for the Delhi Mass Rapid Transport System Project since 1997. With the signing of the loan agreement for Delhi Metro Project Phase 3, the cumulative loan amount provided by JICA for Metro projects in India (including Delhi, Bengaluru, Kolkata, Mumbai, Chennai and Ahmedabad Metro) exceeds 1.2 trillion Japanese Yen (approximately 77,000 crores).

Source - JICA.

Wednesday, 31 August 2016

India Infrastructure Update - Operational Metro Systems ( August 2016 )

Urban transportation infrastructure in India needs big investment and a massive upgradation. It is estimated by various studies that 60% of Indians will be living in urban areas by 2050. After the success of Delhi Metro, lots of Indian cities are exploring the option to implement metro rail project across the country. As per Ministry of Urban Development (MoUD), about 316 kilometres of Metro rail is under operation and more than 500 kms of Metro rail is under construction across the country. This includes metro/mono rail systems promoted by state governments and private bodies under their own arrangements. It is important to note that urban transport is a state subject. Thus, the planning, execution and development of urban transport facilities are done by the states and union territories.

Smart Cities which are under execution of MoUD are incomplete with metro rail systems. China has 20 metro rail systems under operations and additionally investing trillions of Chinese Renminbi on bullet trains and maglev. India's first mono-rail ( Phase 1 ) is operational in Mumbai and final phase is expected to be completed by December 2016. Meanwhile, MoUD and National Highways Authority of India gave final approval to Metrino Pods system in Gurugram. As India mulls innovation in public transport, transport analyst are aware of the fact that Metro is the only viable option for India looking as population and financial constraints.

Metro Systems operational in India 

Delhi Metro

Operational: 213 km | Under Construction: 136 km | Proposed: 105.93 km

Delhi metro The Indian Capitalist
Brown Line - Janakpuri West - Botanical Garden will use Hyundai Rotem Driverless train
The 65.1 km Phase 1 was completed in 2006 while the 124.93 km km Phase 2 was completed in 2011. Currently the 159.327  km Phase 3 is under construction of which 23 kms has become operational. The rest 136 km of lines will open in sections one after the other from 2016 – 2018. Phase 4’s initial new lines & extensions have been finalised and construction is expected to begin in 2018. Within the next 3 years, more routes are expected to be added to Phase 4.

Kolkata Metro

Operational: 28.14 km | Under Construction: 63.39 km  | Approved/On Hold: 32.48 km

Kolkata Metro The Indian Capitalist
AC variant of Kolkata Metro coach manufactured by ICF, Ministry of Railways. Kolkata Metro has also ordered 14 new trains from CNR Dalian, China. 
Construction for it started in 1972 and a small 3.40 km section between Esplanade and Netaji Bhavan opened in October 1984, making it the first metro system in the country. Between 1984 and 1995, more sections opened up bringing its total length to 16.45 km. Kolkata metro was extended by 10.94 km to New Garia station which is also known as Kavi Subhash station.

Mumbai Metro

Operational: 11.4 km | Under Construction: 0 km | Approved: 68.2 km | Proposed: 77.3 km

Mumbai Metro The Indian Capitalist
Western Expressway Bridge in Andheri
OperationalVersova – Andheri – Ghatkopar – 11.4 km
Executed & operated by a JV of Reliance Infra (69%), MMRDA (26%) & Veolia Transport (5%)

Approved ( Construction to begin in September/ October 2016)

- Colaba – BKC – SEEPZ –  33.5 km
To be executed & operated by Mumbai Metro Rail Corporation Ltd – GOI (50%) & GoMH (50%)

- Dahisar – DN Nagar – 18.2 km
This line is part of the larger 40 km line between Dahisar & Mankhurd. To be executed by the Delhi Metro Rail Corporation

- Dahisar (E) – Andheri (E) – 16.5 km
This line is part of the larger 24 km line between Dahisar (E) & Bandra (E). To be executed by the Mumbai Metropolitan Region Development Authority.


Namma Metro ( Bengaluru )

Operational: 30.3 km | Under Construction: 27.1 km | Approved: 59.32 km | Proposed: 102 km

Bangalore Metro The Indian Capitalist
Cubbon Park Metro Station on Namma Metro's underground stretch
Construction for the first phase started in April 2007 following which the Baiyyappanahalli – MG Road  section of the Purple line opened in 2011. The 42.3 km Phase 1 is expected to be completed in 2017. After Phase 2 is completed in 2024 (est), the metro network will become 114.4 km long.

Rapid Metro ( Gurugram )

Operational: 5.1 km | Under Construction: 7 km

Gurgaon Metro The Indian Capitalist

In Phase 1 of the project which opened on November 14 2013, a 5.1 km line was built to link the Delhi Metro’s Sikanderpur station (Yellow line) with the business district of DLF Cybercity. As part of Phase 2, this line is currently being extended by 7 km on Golf Course Extension Road and is expected to be completed in 2018.

Chennai Metro

Operational: 10 km | Under Construction:  35.1 km | Approved: 9 km | Proposed: 132 km

Chennai Metro The Indian Capitalist


Construction for the first phase started in April 2009 following which the Koyambedu – Alandur section of the Blue line opened in June 2015. The 45.1 km Phase 1 is expected to be completed in 2019. A further extension of the Blue line as part of Phase 1 to Wimco Nagar is expected to be completed by 2020. Phase 2 of the project is currently in the proposal stage and in its latest avatar has been proposed to be 123 km long.

Jaipur Metro

Operational: 9.63 km (Phase 1A) | Under Construction: 2.35 km (Phase 1B) | Proposed: 23.099 km

Jaipur Metro The Indian Capitalist


Construction for its 9.63 km Pink line under Phase 1A started in 2011 and became operational in June 2015. Construction on Phase 1B, a 2.35 km extension of the Pink line, started in January 2014 and is expected to be operational in 2018. Phase 2 of the project includes a new Orange line which will connect the heart of the city with the Airport and onward to the Sitapura Industrial Area. This line is planned to be built on the Public-Private Partnership (PPP) model and is yet to be approved.

Information Source - themetrorailguy.com

- Chaitanya Kulkarni